Bhujpool 220KV/33KV (300Mw) PSS at Kutch (GJ) :-
Completing the PSS within 3 Month (confined duration) during which we had face lot of challenges.

Completing the PSS within 3 Month (confined duration) during which we had face lot of challenges.

We had Developed 96.8 Mw Wind Firm renewable Park on Turnkey basis having Total Project Amount – Rs 120 Crore, during which we had face Lots of challenges :

Difficult to make synchronize all different area work in same duration.

In 2012 we had completed Hotline work of 132Kv Transmission line of 48Km.